top of page

Maxwell Bridge
YEAR
2003
LOCATION
Napa, CA
TRADE WORK
Demolition
TRADE WORK
Demolition

Maxwell Bridge
YEAR
2003
LOCATION
Napa, CA
TRADE WORK
Demolition
C.C. Myers contracted Silverado to remove the 50 year old Maxwell Bridge in Napa, CA. A new span had been built beside it. Silverado cut the bridge into 5 large pieces, lowered the sections utilizing a barge mounted crane, and transported downstream barges to a local steel recycling facility.
The demolition work occurred over one of only five navigable waterways in California, and as such, special care had to be taken when other vessels had to cross the straits spanned by the bridge.
bottom of page